Reporting Requirements
13.12.400 Reports of changed conditions.
Each user must notify the public works director of any planned significant changes to the user’s operations or system which might alter the structure or the nature, quality, or volume of its wastewater at least ninety days before the change.
A. The public works director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under Section 13.12.350.
B. The public works director may issue a wastewater discharge permit under Section 13.12.330 or modify an existing wastewater discharge permit under Section 13.12.360 in response to changed conditions or anticipated changed conditions.
C. For purposes of this requirement, significant changes include, but are not limited to, flow increases of twenty percent or greater, and the discharge of any previously unreported pollutants. (Ord. 576, 2008).