Skip to main content
Loading…
This section is included in your selections.

Distribution lines shall be placed underground within the public right-of-way. On all street rights-of-way less than sixty feet in width an additional five feet on each side and parallel to the street right-of-way will be required. Easements for equipment enclosures shall be required as needed. (Ord. 617 §2 (Exh. A), 2011; Ord. 474, 2002).