Skip to main content
Loading…
This section is included in your selections.

At such time as all improvements are completed, the subdivider shall arrange a meeting with the city engineer or other designated city official for an inspection of the work. The subdivider’s engineer or land surveyor or their representative shall be present during the time of inspections. All required monuments as required in this chapter shall be exposed including all street monuments and not corner monuments. The city engineer or other designated city official may survey or cause to be surveyed the subdivision for assurance that all such monuments satisfy the final map or parcel within allowable tolerances. No deferment of monuments shall be allowed. When all improvements are completed, the city engineer or other designated city official shall proceed to release security as provided for in this chapter. (Ord. 617 §2 (Exh. A), 2011; Ord. 612 §2 (Exh. A), 2010; Ord. 474, 2002).